Union Pacific — Boardroom (The Tower)
Executive boardroom integration with auto-tracking camera system.
Union Pacific — Harriman Dispatch Center
Upper floor displays fed from video server to NVX endpoints.
Union Pacific — Control Center
10 video walls with trim kits and touch panel control.
Union Pacific — Main Entry Tour
24 NVX endpoints displaying comms content with relay-triggered history mode.
Union Pacific — Harriman Boardroom
Boardroom AV with touch panel control and DSP.
Centris Federal Credit Union
132nd & Pacific: 1st, 3rd, and 4th floor AV buildouts.
FlyWheel
Historic building AV integration, Omaha.
Fusion Medical Center
Medical facility AV systems.
Weitz Financial
Omaha Blackstone office AV.
Cornhusker Bank
Lincoln, NE branch AV systems.
DJ's Dugout
All locations, multi-site AV deployment.
UNO — College of Business
Full building AV integration.
UNO — Peter Kiewit Institute
Full building AV.
UNO — Strauss Performing Arts Center
Performance venue AV.
University of Nebraska — College of Law
Main courtroom and two classrooms.
SCC — Residence Hall
Student housing AV.
SCC — Agnostic Classrooms
~12 standardized classrooms across Nebraska.
SCC — 84th & O St Addition
Campus expansion AV.
SCC — STEM Rooms
Specialized lab AV.
SCC — Campus 84th & O
Numerous projects across campus.
SCC — Gymnasium
84th & O St gym AV.
Doane College
Interactive classroom integration.
OPS — Millard North
High school AV.
OPS — Omaha North
High school AV.
OPS — Benson
High school AV.
Harrah's Casino
NVX video distribution throughout the property.
The Railyard — Lincoln (WRK Group)
Touch panel programming for video wall content, full audio upgrade, Touch Tunes integration, TV crew takeover capability for commons area.
Presbyterian Church of the Cross — Fellowship Hall 1
Audio system integration.
Presbyterian Church of the Cross — New Addition
Overflow and sanctuary audio.
Presbyterian Church of the Cross — Fellowship Hall 2
Q-Sys Core Flex + TSC replacing Biamp TEC-1, programmed Q-Sys telnet control for Biamp Tesira feedback on UCI.
Coram Deo Church — Phase 1 & 2
Full church AV.
Coram Deo Church — Fellowship Hall
Fellowship space AV.
St. Wenceslaus Catholic Church
Omaha, NE church AV.